Phone: 813.679.5657 Fax: 866.595.3145

When I first enter a client’s home to discuss their kitchen remodeling project, one of the things I am always prepared to present them with is different material options for countertops. That’s because, in a lot of ways, the countertops are one of the most important design elements in a new kitchen. The type, color, and style of countertops you have your Tampa Bay kitchen remodeling contractor install in your new kitchen will be very noticeable at first glance, so choosing a look you love is vital in creating your dream kitchen. For most homeowners, the choice comes down to three different countertop materials. These are granite countertops, quartz countertops, and marble countertops, and here are some of the pros and cons of each:

Read more

Share

A little while back, we addressed some of the most popular kitchen remodeling trends that have been hot in 2013. For this post, we are going to switch rooms to look at the biggest bathroom remodeling trends of 2013. In general, high-end bathroom remodeling has risen in popularity over the past decade as homeowners realized that their bathrooms were not just rooms that served a purpose, but also places that they should be comfortable in. Part of comfort is being in a bathroom that reflects your style tastes. And with the help of an experienced bathroom remodeling contractor who has their finger on the pulse of what todays homeowners want, you can create a bathroom you love to use every day.

Here are the top 5 Tampa Bay bathroom remodeling trends of 2013:

Read more

Share

I know what you’re asking yourself. “What the heck is a Schluter-DITRA membrane?” Well, before I go into all of that, let me first talk a bit about why a tile installation job in Florida may be a little different than anywhere else. Now, if you have never heard the term “house settling,” it means that over years, certain homes begin to slowly sink into the ground. This is especially common in Florida, where the soil that homes are built on isn’t as solid as it is in some other places. This puts more strain on your home’s foundation, which will start to give way over time if not installed perfectly, leading to that damaging “house settling” thing.

Read more

Share

When it comes time to redesigning the bathrooms in your home, there are many things that you may want to have renovated. Some of the more common areas that homeowners like to focus on in the bathroom remodeling process are new sink countertops, tile floors, modern bathroom fixtures, and full new showers. It’s that last area I’d like to discuss, because often too much of the focus in a shower redesign is on aesthetics instead of long-term durability. Now, that’s not to say that your style choice is not a big part of the process. Clearly, when you decide to renovate your shower, you want the finished product to reflect a style that you love. But a good Tampa Bay bathroom remodeling contractorwill also make sure to install a new shower that will repel any possible moisture damage for a long time. That’s why I long-ago decided to use the Schluter Shower System on my shower renovation projects.

Read more

Share

Up until relatively recently, most homeowners thought of their bathrooms as utilitarian. Rooms that needed to be practical. To serve their purpose. But not necessarily rooms that needed to incorporate modern design ideas. As a Tampa Bay bathroom remodeler, that never made any sense to me. You see, the bathroom is the one room in the home that you will definitely make use of every single day. Yes, it is there to do an important job. But if you are going to spend time in there every day, why not try to make it as comfortable as possible? Thankfully, the past decade or so has brought a change in the overall philosophy most homeowners have with regards to their bathrooms. Because of that, there have been many modern bathroom innovations that may fit your wants and needs perfectly.

Here are a few modern bathroom design concepts that will wow you! If you are interested in learning more about them, you may want to talk to your Tampa Bay bathroom remodeler to get more details.

Read more

Share

Photo by Nancy Hugo via cc

When it comes to home remodeling, every year seems to bring different trends. From modernized kitchen styles, to this year’s most “in” color choices, to popular flooring types for your home remodeling project, being up-to-date and in-style is something that is appealing to most homeowners. But as a remodeling contractor, I have noticed another new Tampa Bay home remodeling trend that is starting to pick up steam in 2013. That trend is for homeowners to want new gas powered appliances, specifically gas stoves, vent hoods, and gas-powered tankless water heaters installed in their homes. I, for one, think that this is a trend that is here to stay. Here’s why:

Read more

Share

Each year, thousands of kitchens are remodeled all across the United States. And each year, the products, themes, and styles that homeowners want put into their new kitchen design change in many ways. That’s because just like with any other industry, new kitchen remodeling trends emerge all the time, incorporating both changing tastes and changing technology. This year was no different. So if you are thinking about having your kitchen redesigned by a high-level Tampa Bay kitchen remodeling contractor in the near future, you may want to take a look at these 5 kitchen remodeling trends of 2013 to see which ones interest you:

Read more

Share

Poor installation of rectified travertine tile

There is nothing worse than spending your hard earned money to buy a product, then receiving it and finding out it’s not up to the standards that you expected. And when you are talking about a home remodeling service such as a new rectified travertine tile floor, that experience becomes even more painful. But how can you avoid becoming the victim of a bad tile rectified travertine installation in your home? It all starts with the skills of the Tampa Bay tile contractor who you choose to do this difficult job.

Read more

Share

“I am new to the area, and Jack O’ Trades has been one of the most pleasant companies I ever worked with.  I needed a new bathroom vent fan installed and a number of companies told me it was impossible since we have vaulted ceilings and a small attic space.  After Logan and his team installed the vent fan, patched the drywall, and painted the repairs, I couldn’t even tell it was retro-fitted.”
                                                                                                 
          -Bruce Himelstein  (Angies List customer)

Share

With one child already and another new arrival these clients found that their current three bedroom, one bath house was not providing enough space to accommodate their growing family. Since moving was not an option, the family decided to expand their 1400 square foot South Tampa home. Construction started April 2, 2012 on the previously converted 1950s garage and was completed on June 6, 2012. The project added almost 500 square feet of living space that included a beautiful master bedroom with a modern en-suite bathroom, in addition to a spacious outdoor entertainment area that was sure to impress their neighbors.

Starting construction in the garage provided a bit of a design challenge with its traditional A-frame roof. The low horizontal beams needed to be removed in order to provide the high ceilings the clients were hoping for. Unfortunately, the beams were needed to maintain structural support. To overcome this challenge, the ceiling was reengineered and new, shorter boards were installed higher in the structure to provide the tension and support needed to maintain architectural integrity. This allowed for the high, airy ceilings that the clients were requesting.

                                             
The concrete slab in the garage was not level and was being compromised by tree roots. Because it was below grade it also posed a flooding risk. To prevent these issues from affecting the new living space a new slab was poured over top of the existing slab with wire mesh for additional re-inforcement.

A breezeway from the main house into the garage was already enclosed from a previous home project. Because the breezeway was sitting about 18 inches higher than the area that was becoming the master suite, a creative solution was needed to convert this area into a seamless transitional space. An alcove area and steps were built to provide a stylish and practical solution as a passage into the main house.

The client requested through a change order, after the project had started, a way to access the outdoor living area from the master suite. The wall that was built for the original garage conversion stuck out from the structure and was a bit of an eyesore, it was also not installed to code. This wall was removed and a new wall was constructed flush to the structure providing a more suitable application for the remaining components.

When planning for a home expansion such as this it is very important to consider the capacity of your air conditioning unit. AC units are designed to work according to several factors, including cubic footage and air flow. This client was aware of these factors when they planned the addition. Before construction started, they acquired a larger air conditioning unit that would function properly and cool the added cubic footage. The new space required both supply and return ducts to the main AC system, which can be a tricky task to accomplish depending on the homes construction.

A spacious walk-in closet adjacent to the new master bath and a smaller linen closet were built to provide much needed storage along with a stackable washer/dryer closet.  A louvered closet door was used to allow for the dryer to freely bring in air which it displaces out of the exhaust duct during the clothes drying process.

In the master bathroom the shower was installed using our standard Schluter Waterproofing System which provides a ten year guarantee that insures against any moisture damage. Because cement and grout is porous, traditional methods of installing shower surrounds allow moisture intrusion which will eventually cause mold and degradation of the wallboard supporting your tile. The shower was enclosed with a frameless sliding bypass door that is simple, clean and contemporary which provides an ideal showcase for the custom tile work. A traditional hand-held shower head was installed along with a luxurious rain head. The master bath was finished off with a floating vanity topped off with a marble counter top that added additional storage and modern style.

After expanding their indoor living space the clients were interested in creating an outdoor living space ideal for entertaining.  Belgard pavers, a higher end variety, were laid in an intricate pattern extending to a second level which surrounds the new fire pit. An outdoor kitchen and grill were added along with a low voltage lighting package. The pergola was built with careful consideration to sun exposure in order to maximize shade coverage, and as an added bonus, will help to reduce the temperature underneath as much as five degrees.

The client is so happy with the completed project that they are already considering starting another with us. To add more functionality to their floor plan they have expressed interest in converting the home’s original bathroom into a Jack and Jill style that connects the two original bedrooms. It has been a pleasure working with this client and it is exciting to see this home transform to accommodate this amazing family!

Share

“It was a pleasure working with Logan. He is a rare find here in Florida. He returns phone calls and goes over all of your options. He communicates very well and sticks to the schedule he provides before work begins. Quality of work is also good. If you are doing a remodel or need work done on your home, I would at least call Jack O’ Trades to come out and give you an estimate. You won’t regret it. This is the first contractor I have found in FL that provided this type of service.”

          -Chad Lacko (Angies List customer)

Share

“Logan was quick to respond and promptly came to measure and provide estimates for the work.  He provided many ideas for the projects that we had not thought of and was very helpful with suggestions for a “better way” to do some of the things.  He was prompt and professional.”

          -Jack Harper (Angies List customer)

Share

AFTER_4th floor condo bathroom remodelThis bathroom remodel transformed a tight, cavelike space into a spacious-feeling modern bathroom.  The image to the left was the design inspiration for the space.

All projects have their own unique challenges, in this case, the bathroom was on the 4th floor of a townhome with a restricting  stairwell, and a 45° angled wall which created an awkward layout to the room. 

Additional concerns with a multi-story bathroom remodel exist because you are dealing with framing. Framing is more of an issue with a multi-story remodel because if there are any leaks they will run down to all of the floors underneath.  Obviously that could be an expensive and unexpected turn of events!

Schluter shower systemBecause of the inherent risk associated with a traditional shower water management system, which is the culprit for 90% of the shower remodeling we do, waterproofing is of the upmost importance. This bath remodel was actually the first time we used the Schluter Shower System. That was where our great respect for this waterproofing system, which has a 10-year warranty against water intrusion, began. 

4th floor condo bathroom remodel–beforeAs you can see from the photo, this was a tight space. What you can’t tell was that none of the walls were “plumb” (level vertically), in fact, the wall to be tiled was one inch off from top to bottom. This is a common occurrence which we account for, however not to this degree typically.  Aesthetic, this poses a real problem when your intention is to install rectified tile (square edge) like many modern bathrooms are trending towards.  This type of tile is designed to be installed perfectly plumb in order to achieve the crisp look it is intended to create.  If your installer is not a professional tile layer or your contractor doesn’t catch it, you’re finished tile work will reflect the inexperience.  

 This is just one of the many unanticipated things you can run into on any project. At Jack O’ Trades we try to cover every potential “change order”, or “thing that we might encounter unexpectedly” during the course of the project that could change the cost or length of time it takes to complete, so that our clients don’t have too many surprises. 

Floor to ceiling tile in shower enclosureThough the size of the room was small, it did have high ceilings. By using a larger format 12″ x 24″ tile, installed floor-to-ceiling, and a floating vanity cabinet, the illusion of a larger space was created.  These two components were the key to achieving the  modern, minimalist feel of the clients were craving in their remodeled bathroom. 

 

After, 4th floor remodel, white countertopThe clients also chose a white glass countertop. Normally a counter like this would have cost around $90 a square foot but because it was a remnant they were able to get it for a much lower price. 

The obtrusive track lighting on the ceiling was replaced with six inch recessed can lighting, which is another look we prefer because of the space and simplicity it provides. Also, whenever we do a bath remodel we always proactively replace the various plumbing fixtures throughout the remodeled space to minimize the chance of future leakage and ensure a warrantable finished product. 

This client was very happy with their new bathroom. We were able to achieve the more open-looking, modern feel that they had in mind. We enjoyed working with them and they have called back to have more work done–a great success for all parties involved! 

 

Share

“This guy was great, I really liked him. They were punctual and they returned my call immediately. He was on time and he called to let me know when he would arrive. He explained what was going on. The price that he estimated turned out to be the price of the job. The people that came out to do the job were very neat and very respectful.”

          -Tamiko Gantt (Angies List customer)

Share

Photo by Djenan Kozic via cc

When homeowners decide to remodel their residences, one of the most common areas they focus on is flooring. Years ago, this usually meant ripping up old, worn carpet and replacing it with new carpet. Then, tile and wood began to come into style, creating a much cleaner look and feel throughout the home. But recently, you may have noticed a ton of your friends having their Tampa Bay laminate flooring contractor replace their old floors with laminate flooring. But why did they decide to go with this new substance, and should you follow their lead? Here are some benefits that may make the explosion of laminate flooring’s popularity a bit clearer.

Read more

Share

Even though they are used multiple times per day, bathrooms used to be the most hidden and forgotten room in the home. They existed to serve a practical purpose, and that’s how they were often treated from a design perspective. Drab, sterile, and oftentimes ugly, bathrooms were just simply not shown off at all. But over the past decade, things have changed. Homeowners realized that, just like any other room in their house, having a bathroom that fits their taste will create a more enjoyable and comfortable living experience. And one of the best ways to do this is by having a Tampa Bay tile contractor replace your old, stained bathroom tile with a more modern, trendy look.

So if you are thinking of renovating your bathroom, here are some of today’s best modern bathroom tile styles that may give you some ideas on what direction you’d like to go in:

Read more

Share

St. Pete beach house. Before shot #1. jackotrades.biz. Kitchen remodel.On March 29, 2011 we met with our potential clients to discuss a full remodel of the outdated 1980’s-era kitchen as well as a major deck remodel for their stilt home.  

The clients wanted a modern, functional kitchen with specialty features including a farm sink, an over-the-range hood, custom-painted cabinets, and wood floors in the kitchen and dining space.

We laid out the design concept with the clients in a 3-D model and, as always, we collaborated St. Pete beach house. Before shot #2. jackotrades.biz. Kitchen remodel.with our cabinet designer so that he could offer suggestions and correlate the design with the actual product. Project schedules are generally coordinated around the delivery of the cabinets, which on average take about three weeks to come in.

This project presented unique challenges because of the specific specialty features that the clients desired. As a rule, these out-of-the-ordinary amenities are considered luxury items. They tend to increase the estimate dramatically because they demand more management, installation is more difficult, and the components are more costly.

Farm sinks pose a particular challenge as they are not typically used in Florida homes, so there is a general lack of the familiarity which comes with repetition of installation.  Before the installation can occur, the complexity of planning for a farm sink must be considered; The height and width of the sink must be very carefully calculated to determine the correct sized cabinet to order, which requires modification at installation to support the sink properly.  The visual exposure of the sink itself, countertop edges, and adjacent cabinetry, this “trifecta” of three mediums, makes the incorporation of a farm sink a far more complex selection than a standard under-mount or drop in sink.

For the issue of wood flooring in the kitchen, unless a client is adamant, we typically do not suggest the use of wood in a wet area like a kitchen or bathroom for the obvious reason that if there are any leaks, the floor will be damaged quite extensively in many cases.

St. Pete beach house. After shot #1. jackotrades.biz. Kitchen remodel.Paint-matching the cabinetry was the biggest learning curve of this project. When cabinets are custom-painted, it is done with a lacquer paint sprayer at the factory. It is then very difficult to find matching touch-up paint to repair the little dings and scrapes that naturally occur during delivery and installation. We eventually had to hire a master furniture artist to match the color and finish exactly.  With a little breathe holding, the final finish came out virtually perfect, however I am still not an advocate of the process.

The over-the-range hood is one great example of why you should hire a licensed contractor who clearly understands the particular dynamics of your project, will ensure the project is code compliant and that the required permits are in order so that your project is not issued a “Stop work order” by a city official, causing unnecessary delays and fines.

If a range hood consumes more than 400 cu ft. of air per minute, the equivalent amount of air must be compensated for from the outside of the home through what is known as a “make-up air system”. This system is barometrically controlled and can be a significantly unexpected challenge to install. The make-up air system alone can almost double the cost of installing a range hood and have hidden costs depending on the construction style of the home. In addition, a range hood over a gas range must duct outside the house, not only to meet code, but to ensure the safety of your family. In this kitchen remodel, a make-up-air system was not required since the code was changed after this remodel was completed. The challenge with this kitchen were the angled ceiling, requiring custom fitting working and the low height of the ductwork from the previous range hood.

Despite the numerous unique challenges, each of these features were completed with beautiful results.

The functional island with seating was an additional added amenity. Kitchen islands are St. Pete beach house. After shot #2. jackotrades.biz. Kitchen remodel. Island.required to have power running to them; not a problem in this case, being that it was a wood frame, stilt house with easy accessibility. Obviously this can be more of an issue when having to excavate through concrete sub-floors to provide the required power.

Another electrical requirement, added to the code in 1984, in kitchens is that there must be a GFI (Ground Fault Interrupt) outlet every four feet for safety and functionality, so these were added wherever necessary. A GFI outlet is a type of electrical outlet that detects an imbalance of current and automatically trips a breaker when the imbalance reaches a specific level. The GFI is designed to protect against electrocution in high-risk areas, such as bathrooms, kitchens, garages and outdoor areas.

St. Pete beach house. After shot #3. jackotrades.biz. Kitchen remodel. Wine fridge.Replacing the low-hanging track lighting with recessed can lights opened up the space and made the angled ceiling seem even higher. And the addition of a small custom wine fridge at the end of the kitchen counter created added functionality.

The clients reused and transported their own refrigerator which leads us to offer one word of caution. We always suggest that our clients be cognizant toward the idea of re-using anything from the existing space being remodeled, if it can be helped; pre-existing damage, lost parts, damage caused upon removal or from transporting are several reasons for this consideration, which at the the time of installation can pose an uncomfortable situation in determining the culprit.

This project was started on May 16, 2011 and completed by June 28, 2011. The clients loved their new kitchen.

Share

Jack O’ Trades has earned the service industry-coveted 2012 Angie’s List Super Service Award, an honor awarded annually to approximately 5 percent of all the companies rated on Angie’s List, the nation’s leading provider of consumer reviews on local service companies.  This will be the fourth year in a row we have attained this level of customer satisfaction!

Share

 

At Jack O’ Trades, education and experience are paramount.  An improperly installed job may look good at first glance, however, the problems will eventually be discovered, likely, when your contractor is nowhere to be found.  Hire a contractor which has taken the steps to ensure a proper installation of the integral part of your shower remodel.

 

Share

This bathroom remodel had a soffit built into the ceiling area above the shower which the client wanted removed to increase the space of the bathroom.  Upon removing the soffit, we discovered that electrical and plumbing lines were run through the space.  These, of course, had to be relocated to allow for the desired layout of the wall and ceiling.  The biggest issue with this seemingly simple adjustment was the load bearing beams seen in the background of the image.  These beams cannot be altered, and they are immediately in the way of where we needed to re-route the plumbing lines!  After some deductive reasoning, the most viable solution was to route the water lines against the concrete block wall and on to their final destination, everything worked out great with a very reasonable adjustment to the price of the job.

Share

On February 20th, we met with our potential clients, Brad & Cheri to discuss their master bathroom remodel.  A rather small space at 4′ x 10′, of which 90% of the demolition work had already been completed.  They were planning on doing all of the work themselves and realized the complexity of what was involved, so they found us on Angie’s List and called for a free estimate. 

 Upon inspection of the job, some additional demo was still needed and the concrete basin in the shower needed to be removed after the first attempt went array.  (If you look closely at the image to the right, you will not find the traditional rubber liner used in archaic shower remodels which would be an absolute integral part of the installation.  Had this project proceeded, water would literally poor from the base of the shower to the spaces surrounding the shower.  This would have required a 100% removal and reinstallation of the shower to correct.)  Brad opted to do the remaining demo himself, which he was perfectly capable of completing, as he had already demonstrated!

 We provided, as always, a highly detailed estimate and a detailed list of everything they needed to provide for the finish materials (essentially all materials requiring an opinion, such as: faucets, tile, mirror, fixtures & vanity).  Upon approval of the estimate, we scheduled the start of the job for April 9th with an estimated timeline of 3-4 weeks.  

To prevent any potential leaks in the future and for the most peace of mind, we used the Schluter-Kerdi Shower Waterproofing System, which is a requirement for all of our shower remodels.  We always suggest to replace the shower or tub valve and the valve stops for the vanity and toilet with all of our projects regardless of age to eliminate any potential existing issues.  Based on the cost versus the benefits, the clients opted against centering the drain in the shower, which is merely an aesthetic preference.  Some electrical changes were made including elimination of the wall mounted sconce light, adding of two recessed can lights in the ceiling, a bath exhaust fan, and relocation of an outlet.  Granite was the choice for the vanity countertop, shower threshold, shower shelving and window sill.

The tile the clients selected complimented the granite very nicely, however the pattern selected was fairly complex, which was a little different than what our estimate accounted for, resulting in a small change order.  As with many of our estimates, tile and the tile pattern has seldomly been selected at the time, so we base the cost on a basic installation.  If an “exotic” tile is selected or complex pattern is chosen the cost can change.  We originally bid a metal framed glass shower enclosure, however after seeing the dramatic difference of a frameless glass enclosure, the clients found room in their budget to upgrade.  The frameless glass enclosure provided a virtually invisible and obstruction-free view of the beautiful tile selected for this newly remodeled bathroom.

This project had very few potential “surprises” as the demo was completed prior to bidding, so we did not expect too many additional costs to pop up.  The entire project had  only 2 small change orders:  replacement of the cast iron drain flange for the shower and small change in the details of the tile work, requested by the client. 

The job was finished Tuesday, May 1st, 2012, right on schedule at 3 weeks!  

 

Share

Schluter shower system illustration

The Schluter Kerdi-Shower System is specifically designed to protect underlying moisture-sensitive construction materials such as wood framing, plywood or OSB sheathing, and gypsum wallboard–items that can lead to structural damage and mold problems when exposed to prolonged moisture.

The following description is from the Schluter-Shower System website: 

“The Schluter-Shower System is an integrated family of products which together create a fully waterproof and vapor tight enclosure in tiled showers, steam showers, and bathtub surrounds. The system is unique because the waterproofing layer is installed at the top of the assembly, directly behind the tile, rather than below. This eliminates the potential for moisture to seep into the mortar bed or the tile backing on walls, and allows the tile covering to dry between uses.

The Schluter®-Shower System eliminates leaks, reduces the potential for efflorescence and mold growth in the system, and dramatically reduces total installation time to ensure success and make shower installation easier than ever.”

Jack O’ Trades has been incorporating the the dynamic capabilities of the Schluter Kerdi-Shower System into all of our shower remodels since 2010, ensuring our clients will never need to remodel a shower due to water damage or mold intrusion again.

Share

Once you have decided to remodel the floors in your home with new tile, the next step you have to make as a homeowner involves which type of tile want to use. To most people, that means carefully selecting the type, size, shape, and color of each tile. But there is also another decision that you will need to make with the help of your Tampa Bay tile contractor, and it’s a choice you may not even know exists. That choice is between non-rectified tile and rectified tile, and your decision will have a major effect on the look of your floor, the installation process itself, and the cost of your job. But in order to know whether your home remodeling project would come out better by using non-rectified tile or rectified tile, you first need to learn some basics about each type.

Read more

Share

Angies List awards Jack O’ Trades with the highly coveted Super Service Award for maintaining a superior service rating throughout the 2011 year in multiple categories.  This is our third year in a row maintaining such a high level of customer service for intricate and detailed Bathroom & Kitchen Remodeling, completing the constantly growing “honey do lists” with our Handyman Services and changing your backyard into an outdoor living space with our Pavers, Decks & Hardscape Services.

Share

When it comes to renovating bathrooms, one of the most common questions a homeowner will normally ask their contractor is “How do I make this little room look and feel bigger?” Now, unless you want to tear down walls, add square footage, and do a major renovation to your home, this may seem impossible. But if you are working with a creative and innovative Tampa Bay bathroom remodeler, they may have some ideas that will surprise you. One of these forward-thinking ideas is to install a modern glass shower enclosure, which will serve to open up the space in your bathroom and make everything feel bigger and more luxurious.

Read more

Share

“Logan Steege is a superior individual who performs Outstanding High Quality work. Logan and his Team have remodeled two bathrooms in my home. Logan performed both jobs ahead of schedule and on budget. Logan kept me updated on the progress of each job while I was out of town, in travel status. You can count on Logan to get the job done timely, with excellent, superior Quality.”

     -Chris Manakas

Share

Jack O’ Trades has earned the service industry-coveted 2010 Angie’s List Super Service Award, an honor awarded annually to approximately 5 percent of all the companies rated on Angie’s List, the nation’s leading provider of consumer reviews on local service companies.  This will be the second year in a row we have attained this level of customer satisfaction!                                         

Share

If a full glass enclosure is not in your budget for your shower or bath remodeling project, why not make it look a bit more intended.  This is a simple, cheap, and attractive way to leave your shower curtain daily.  The vase and grass fronds were purchased from IKEA for under $30.  By spending 10 seconds after you shower your bath space can have a designer appeal, without the expense.  Then, when you are ready, add a glass enclosure!

Share
Is this happening to your shower?

This is happening to every shower with only drywall board behind the tile.  Water absorbs through the grout and into the drywall paper causing it to delaminate from its gypsum core. Eventually the static force of the tile gives way, crumbling the degraded drywall behind, resulting in a complete shower failure.  A full remodel of the shower is the only correct way to repair this type of damage. This is why we use the Schluter-Kerdi Waterproofing System, to ensure this never happens to your shower again.

 

Share

Jack O’ Trades has earned the service industry-coveted 2009 Angie’s List Super Service Award for Kitchen & Bath remodeling, Decks & Hardscapes, Handyman and Flooring Installation, honors awarded annually to approximately 5 percent of all the companies rated on Angie’s List, the nation’s leading provider of consumer reviews on local service companies.

Share

Contact Us

All fields are required

captcha

Logan Steege, Owner, JackO'Trades Owner & President Logan Steege relocated to Tampa in 2003 to assist in a local start-up building 25 new homes in under two years. In 2005 Jack O’ Trades was launched. In 2010 he acquired a State Certified Residential Contractor license (CRC 1330291). Logan has an uncanny eye for detail and imaginative functionality. Jack O’ Trades is more than a contractor bidding and completing your job, we will share ideas with you, inspire design, and work with you to visualize and create the best use of your space. Logan continues to keep both hands on every project, but also offers you his eyes for aesthetics and ears for understanding your desires to make you love where you live.